Maple Bear – EDGE Audit

portfolio cover image

Challenge

Final EDGE audit (post-construction phase) for a school project consisting of two blocks (4 and 2 stories).

Mitsidi Performance

On-site audit of the school building to verify as-built compliance and eligibility for final certification.

Results

  • Energy Efficiency Measures:

  • Photovoltaic systems – 100% of total energy use;

  • Natural ventilation in hallways;

  • Light-colored roofing (SR=0.28);

  • Occupancy sensors in restrooms and hallways.

  • Water Efficiency Measures:

  • Low-flow faucets in bathrooms and kitchens;

  • Dual-flush water closets (6L/3L) and efficient urinals;

  • Rainwater harvesting system.

mitsidi logo icon

Clients

mapleBearLogo

Gallery

mapleBear
Related items
MEPS And Labeling – IEA 2025 Policy Collection
MEPS And Labeling – IEA 2025 Policy Collection

Clients IEA

Standards and Certifications

EDGE Audit - Vamos Valtra Alta Floresta – Green Edifica
EDGE Audit - Vamos Valtra Alta Floresta – Green Edifica

Clients Vamos Valtra Alta Floresta , Green Edifica

Standards and Certifications

EDGE Expert Certification at Obramax Duque de Caxias
EDGE Expert Certification at Obramax Duque de Caxias

Clients Obramax Duque de Caxias

Standards and Certifications

Complete portfolio
Portfolio

Click here to see the full project portfolio